Working together with our Clients

At Pristine London we take great pride in building relationships with our clients. We always aim to exceed expectations and be pro-active on projects, with a highly organised, experienced in-house team.

Below are a few references from some of clients we have worked with.

“Pristine have just completed the phased strip out of level 2 & 3 for us at Project Vesta, Canary Wharf, of over 9000m² office space.
They are very thorough in their approach to setting up and managing works, and scored consistently high on all aspects of H&S.
I would highly recommend using Pristine since they are very flexible and responsive.”
Shayne McFadden Construction Manager , ISG
“I have contracted Pristine London on a number of projects over the past 3 years, in my current commercial position with ISG and my former commercial position with Structuretone. I have found them to be a proactive subcontractor with a very organised work ethic once they arrive to site. They performed particularly well at Fraser’s Place (boutique hotel refurb at Gloucester Road) on a sizable strip out and builders works package. They are straightforward to deal with and I would have no hesitation in recommending them to others”

Sophie Donaldson Commercial Manager , ISG
“We have used Pristine on a large office refurbishment in Hammersmith since June 2014. They have been extremely cooperative in all aspects of their contracted work that consisted of. The soft strip of 4nr large office floor areas, the decant of all heavy plant from a substantial internal & external roof plant areas that necessitated 14 weeks of out of hours working, due to the site being adjacent to the main bus & under ground stations in Hammersmith. We have also used them for all the builders work requirements for the new M & E installation. Their safety control & associated paper work has been excellent, along with the supervision of their respective work force.
Hope the above comments assist & feel free to give me a call if you wish a verbal recommendation.”
Ruth Biddulph Contracts Manager , Bowmer & Kirkland
“Pristine have completed a ‘soft strip’ demolition package of works under our Project Management for a city based investment bank.
The team were committed competent and efficient. Pristine adopted a pragmatic and flexible approach when it came to the inevitable clarifications and variations. The project was completed on time and to an excellent standard. A benchmark has been set for other demolition contractors!”
Edward Gregg Project Management , JLL
“I’ve had the pleasure to deal with Pristine London during Q2 and Q3 2016 regarding the strip out works to levels 9 and 10 of the Barclay Investment Banking site at 5 North Colonnade in Canary Wharf London. The works required Pristine to work within a live environment, be sympathetic and flexible to the business needs and priorities of the bank whilst executing their work to a tight deadline. Pristine have been able to complete the works with little incident, showing concern and understanding for the needs of the customer base whilst executing in full support of client needs.

Their attitude toward safety, to getting the job done correctly and their engagement with various stakeholders inclusive of the building management team have been exemplary. Alex Wright and his team at Pristine have been well organised in terms of the production of RAMS, progress reporting, stakeholder management and engagement and have displayed the required ‘can do’ attitude whilst always adhering to their high professional standards.

I have no hesitation in recommending them for similar works in similar environments and look forward to working with them again in the future.”

Ben Knapp General Manager , Barclays
‘From receiving your very professional and very precise RAMS, the bar had been set and your team met every target.Your team worked diligently and quietly in what was an occupied space that had been partitioned off…They showed the utmost respect to the Clients team and their visitor’s.’
Garry Bannigan, Quad, British Land
‘All your operatives and especially Artan have been a huge help and efficient in everything they have done’
Chris O’Connor, Spie, Shell HQ
‘Kindly extend our appreciation to your site team for their continued proactive approach. This commitment to excellence is to be commended’
Emmanuel Nibo, Senior Project Manager , Queen Mary University