The Pristine London site team has been involved with a multitude of additional works over at the Minories Development which has expanded the account significantly to circa £2.6M.

Following the initial successful delivery of demolition and structural alterations over 13 floors, the clients team engaged Pristine London to undertake the following additions:

  • A roof level extension with a new curved RC parapet wall and plinths. The perimeter wall is 100metres with a total slab area of 500sqm
  • Extensive steel work additions to form new risers ensuring the structural integrity of the building
  • Extensive FOSROC repairs.
  • Groundwork investigations and formation of new basement service pits

The project is located opposite Aldgate station. It has moved along significantly in recent months and its fantastic to see the building taking shape.